Model: - Electric and Non Electric
Heating Boiler: - Indirect Pressurized Steam Heating
Construction: - Single Wall Construction
Chamber: - Made 10 MM Thick Gauge Mild Steel Sheet Duly Painted With Heat Resistive Paint. Totally Leak Proof, Chamber Prevents Temperature Losses
Pressure: - Up to 7 Kg
Feature:-Built In Pressure Indicating Gauge, Safety Valves, ISI Marked Gate Valve, Release Valves and Water Drainage System
Heaters: - Industrial Heaters 6 Kw Available In 3/1 Phase
Ash Tray: - Ash Collecting Tray Also Provided At the Bottom of the Boiler
Steamer Top Cover: - Thick Mild Steel Plate Top Cover with Silicon Rubber gasket sealing to prevent leakages. Heavy duty hinges & locking arrangement
Steamer: - 6 MM Thickness MS Plate rolled, Double Welded for maximum capacity of 60 / 80 / 160 / 320 Kg of cashew Kernels
Bottom Legs: - At Bottom rigid legs are provided to hold the boiler
Top Loading: - Top loading arrangement for raw cashew inside the boiler
Holding Plate: - Cashew holding perforated sheet is fixed at the bottom above water level
Easy Unloading: - Tapered down flap type opening provided for
Safety Measures:-
1. Boiler chambers are hydraulically tested for 20 PSI
2. Dial type pressure indicator will be provided
3. Spring loaded mechanical safety valve will be provided
4. Water level mechanical arrangement will be provided